Linac control room at INAS completed
NEWS | 2020 / 03 / 12
Most recently the Control Room for the linear accelerator at Zhejiang University’s Institute for Nuclear Agro-Science in Zijingang Campus has been completed. The design covers the control room, a preparation room and the ante-chamber of the accelerator. Lamella ceiling with linear and spot lights was used throughout the project. The control room is separated by glass partition walls and is covered in metal panels which form the background for the control desk.
Please click here for the project page of Linac Control Room.